Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia

Author:

Al-Gahtani Khalid1ORCID,Shafaay Maan1,Ahmed Omar1,Alawshan Marwan1,Alsanabani Naif1,Aljadhai Saad1

Affiliation:

1. Department of Civil Engineering, King Saud University, P.O. Box 800, Riyadh 11421, Saudi Arabia

Abstract

Evaluating risks is crucial for the smooth execution of pipeline projects. In Saudi Arabia, pipeline building projects frequently experience delays and cost overruns. This study tries to identify these risk factors. Thus, risk factors were collected from the literature and presented to four experts to identify the 26 most common factors for pipeline construction in Saudi Arabia. The risk factors were then assessed using a questionnaire to measure the degree of impact of the 26 factors by 135 participants. Partial least square structure equation model (PLS-SEM) and relative importance index (RII) methods were utilized to rank the significant factors after performing the reliability and discriminant validity of the questionnaire data. The findings show that the top five factors based on PLS-SEM were discrepancy between implementation requirements and specifications, financial failure/bankruptcy, poor pipeline material quality, supplying invalid materials, and weak ability to identify and monitor the threats. The ranking of the factors using PLS-SEM is different in the RII method. This difference is due to applying the Cronbach’s α formula in the two methods. The PLS-SEM computes the coefficients of the groups, while the RII computes the coefficients for all factors. The study results can assist pipeline project managers in identifying and ranking risk variables to efficiently utilize the limited financial and human resources available for the risk management.

Funder

Ministry of Education – Kingdom of Saudi Arabia

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference37 articles.

1. Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects

2. Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis;A. Ardeshir;International Journal of Civil Engineering,2014

3. Pipe dreams: the failure of the private sector to invest in water services in developing countries;D. Hall,2006

4. Review of ways to transport natural gas energy from countries which do not need the gas for domestic use

5. Environmental and economic life cycle assessment of PEX and copper plumbing systems: A case study

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3