Abstract
This paper investigates the utilization of a STATCOM to enhance the LVRT capability of wind power plants (WPPs) during grid faults. The STATCOM under investigation is tuned using the Water Cycle Algorithm (WCA), Particle Swarm Optimization (PSO), and a hybrid algorithm of both WCA and PSO. Simulations are conducted in MATLAB programming software, using the SimScape power system toolbox, where two test systems are investigated: a 9 MW WPP and the IEEE 39 bus test system. Performance analysis is done by investigating the ability of the WPPs to ride through grid voltage sags, with the incorporation of the STATCOM, independently tuned using WCA, PSO, and further with the hybrid WCA-PSO algorithm. To confirm the effectiveness of the proposed algorithm, simulation results for the three scenarios are compared. Results show that the LVRT capability of the German power system was met for L-G faults, for the 9 MW test system, whereas during LLL-G faults, the WPP only remained online for WCA and WCA-PSO tuned STATCOM. For the IEEE 39 bus system, the WPPs were able to ride through the LLL-G fault. In all scenarios, the WCA-PSO tuned STATCOM resulted in the least voltage, active, and reactive power overshoots.
Funder
Pan African University Institute for Basic Sciences, Technology and Innovation
Subject
Electrical and Electronic Engineering,General Computer Science,Signal Processing
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献