Stability Analysis and Construction Parameter Optimization of Tunnels in the Fractured Zone of Faults

Author:

Huang Banma1ORCID,Chen Haibo2ORCID,Duan Chenglong2ORCID,Li Wenhu1ORCID

Affiliation:

1. Qinghai Traffic Engineering Technical Service Center, Xining, Qinghai 810001, China

2. China-Road Transportation Verification and Inspection Hi-Tech Co., Ltd., Beijing 100088, China

Abstract

In order to improve the construction method of highway tunnel fault, improve the excavation level, improve the construction efficiency, reduce the project cost, and shorten the construction period, so as to find a specific road, this paper puts forward the research method of tunnel stability analysis and construction parameter optimization in the fault fracture zone. First, this paper analyzes the specific geographical and geological environment of the construction site. Second, this paper compares and analyzes the effects of the drilling and blasting method and full-face tunnel boring machine (TBM) in construction and further analyzes the surrounding rock deformation, over excavation, and under excavation, as well as the range of loose circles when the surrounding rock is stable. Then, this paper discusses the minimum smooth blasting parameters under these conditions. Finally, the actual blasting effect of tunnel construction is tested and the optimization algorithm model of tunnel fault drilling and blasting parameters is established. The results show that the proposed optimization model of drilling and blasting construction parameters for highway tunnel faults based on the Support Vector Regression (SVR) algorithm combined with a genetic algorithm (GA) has a short calculation time and high parameter optimization accuracy. It is very feasible to optimize the construction parameters of the fault drilling and blasting method, which can greatly improve the construction efficiency, carry out the detailed simulation, reduce the cost, and increase safety. In summary, it has a certain reference significance for the optimization of highway tunnel construction and future research by drilling and blasting method under complex geological conditions in my country.

Publisher

Hindawi Limited

Subject

Analytical Chemistry

Reference16 articles.

1. Optimization of smooth blasting parameters for mountain tunnel construction with specified control indices based on a GA and ISVR coupling algorithm;K. Liu;Tunnelling and Underground Space Technology,2017

2. The ceneri base tunnel: construction experience with the southern portion of the flat railway line crossing the Swiss alps;D. Merlini;Engineering,2018

3. Characteristics of capillary discharge channel and its effect on concrete splitting-off by electro-blasting method

4. Modelling the torque with artificial neural networks on a tunnel boring machine;P. Cachim;KSCE Journal of Civil Engineering,2019

5. Performance prediction of tunnel boring machine through developing a gene expression programming equation;D. J. Armaghani;Engineering with Computers,2017

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3