Research on the Inflow Performance of the Plunger Lift in the Shale Gas Horizontal Well

Author:

Ye Changqing1,Tang Hanbing1,Cai Daogang1,Xie Nanxing1,Wang Qingrong1,Liu Jianyi2,Jiang Lu2ORCID

Affiliation:

1. Engineering Technology Research Institute of PetroChina Southwest Oil & Gas Field Company, Chengdu 610000, China

2. State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu 610500, China

Abstract

Shale gas wells in the Changning block of Weiyuan, Sichuan, China, experience water production problems throughout their life cycles. In actual field production, plunger lift is typically used to discharge liquid from a shale gas well. However, it is difficult to test the formation inflow performance relationship curve (IPR) of a plunger lift well. Hence, data on the formulation and optimization of plunger lift well systems are lacking. Based on actual measured data related to casing pressure changes at the wellhead and the gas-liquid distribution characteristics in a wellbore during the shut-in phase, this paper establishes a method for calculating the formation IPR curve of a shale gas plunger lift well by calculating changes in wellbore gas volume continuously. This method has a fast calculation speed. The gas-water interface distribution can be obtained in 3–5 iterations, and the inflow dynamic curve can be calculated in less than 5 seconds. This method tested the IPR curves of gas wells in the Changning block. The IPR curves of plunger lift wells showed concave characteristics contrary to the conventional upward convex curves. This is because the bottom hole flowing pressure changes caused variations in the water saturation of the near-wellbore zone. Consequently, the productivity equation of the plunger lift well is established by introducing the variation coefficient of water saturation expressed by bottom hole flow pressure. This equation fits with the measured IPR curve with an average R2 of approximately 0.9989.

Funder

Gas Reservoir Engineering Laboratory of Southwest Petroleum University

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Transient modeling of plunger lift with check valve for gas well deliquification in horizontal well;Energy Sources, Part A: Recovery, Utilization, and Environmental Effects;2023-03-08

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3