Numerical Analysis of the Mechanical Responses and Transition Section Design of Pavement Structures in the Entrance and Exit Sections of Highway Tunnel

Author:

Zhao Xueying1ORCID,Shen Aiqin2,Ma Baofu3

Affiliation:

1. School of Civil Engineering, Qingdao University of Technology, Qingdao 266520, China

2. Key Laboratory of Highway Engineering in Special Region of Ministry of Education, Chang’an University, Xi’an 710064, China

3. China Communications Construction Company Highway Consultants Co., Ltd.,, Beijing, China

Abstract

The entrance and exit sections of a tunnel are subject to different environments, pavements, and traffic conditions, which is quite different from the average highway, and it should be considered differentially, when designing pavement structures. However, there are no clear regulations on it in Chinese specifications. Over the years, a lot of studies were carried on the entrance and exit sections of a tunnel, but there are few ones on the pavement design and its mechanical response characteristics. In this paper, the Huangjiayu tunnel and the Yangkou tunnel in Shandong province were taken as case study engineerings and their pavement structures in the entrance and exit sections are referred to as Str-1 and Str-2, respectively. In Str-1, asphalt pavement was applied inside and outside the tunnel and a transition section was applied. In Str-2, asphalt pavement was applied outside the tunnel and concrete pavement was applied inside the tunnel when it was built in 2004 and a transition section was not applied. Meanwhile, 7 alternative pavement structures (referred to as Str-1a∼Str-1g), in which the lengths of transition sections were different, were proposed, simulated, and analyzed through FE program ANSYS. Through the analysis of maximum shear stresses in asphalt courses and tensile stresses at the bottom of base courses, it was found that setting a transition structure is essential, and it can ensure the continuity of pavements and significantly reduce the sudden change of shear stress of asphalt layer and thus prevent premature pavement distresses. Hence, Str-1 is more reasonable compared with Str-2. Besides, it was also found that when the asphalt surface outside the tunnel is designed to be three layers, it is more appropriate to use Str-1, in which the concrete slab in the transition structure has variable cross section, and the length of the concrete slab is 4.5 m. When the asphalt surface outside the tunnel is designed to be two layers, Str-1b is more reasonable and the length of the concrete slab is also 4.5 m.

Funder

Department of Transport of Shandong Province

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference31 articles.

1. Temperature field analysis of typical pavement structure at the entrance and exit of tunnel;S. Li;Journal of Highway and Transportation Research and Development,2013

2. research on curve coordination of tunnel inlets and outlets;W. Ji;Technology of Highway and Transport,2014

3. Alignment design at tunnel entrance and exit zone based on operating safety;Y. Wang;Journal of Highway and Transportation Research and Development,2008

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3