Resource Unconstrained and Constrained Project Scheduling Problems and Practices in a Multiproject Environment

Author:

Kannimuthu Marimuthu12ORCID,Ekambaram Palaneeswaran1,Raphael Benny2,Kuppuswamy Ananthanarayanan2

Affiliation:

1. Department of Civil and Construction Engineering, Swinburne University of Technology, Melbourne, VIC 3122, Australia

2. Department of Civil Engineering, Indian Institute of Technology Madras, Chennai 600036, India

Abstract

Construction companies execute many projects simultaneously. In such situations, the performance of one project may influence the others positively or negatively. Construction professionals face difficulties in managing multiple projects in limited resource situations. The purpose of this study is to identify the problems in multiproject scheduling from the practitioner’s perspective and to discover current practices under resource unconstrained and constrained settings. The specific objectives are (1) determining the most challenging issues being faced in handling multiproject environment, (2) enumerating the practices adopted in the industry, and finally (3) identifying the practitioners' perceptions on the multiproject scheduling aspects such as network modeling approaches; activity execution modes; concept of sharing, dedicating, and substituting resources; centralized and decentralized decision-making models; solution approaches; and tools and techniques. An online questionnaire survey was conducted to address the objectives above. The top challenging issues in managing multiproject environment are identified. Factor analysis identified the factors by grouping the variables (a) decision-related, (b) project environment-related, (c) project management-related, and (d) organization-related factors. Resource-unconstrained situation mainly faces the issue of underutilization and wastage of resources leading to lower profit realization. The following findings were identified to overcome the unconstrained resource situation such as identifying the work front, adopting pull planning approach, creating a common resource pool, and allotting it on a rental basis. On the contrary, resource-constrained situation faces the issues of prioritization of resources, coordination, communication, collaboration, quality issues, and rework. The findings suggest the strategies such as top-up via subcontracting, proactive pull planning, introducing buffers, training the culture of the organization towards better communication, coordination, and collaboration, to improve the reliability of achieving baseline project performances. Various multiproject aspects suggested for effective management. The identified problems, practices, and various multiproject aspects are expected to contribute better management of multiproject resource unconstrained and constrained project scheduling.

Funder

Swinburne University Postgraduate Research Award (SUPRA)

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3