Affiliation:
1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, China
2. School of Civil Engineering, Southwest Jiaotong University, Chengdu, China
Abstract
Constructing a shield tunnel that crosses under a river poses considerable safety risks, and risk assessment is essential for guaranteeing the safety of tunnel construction. This paper studies a risk assessment system for a shield tunnel crossing under a river. Risk identification is performed for the shield tunnel, and the risk factors and indicators are determined. The relationship between the two is determined preliminarily by numerical simulation, the numerical simulation results are verified by field measurements, and a sample set is established based on the numerical simulation results. Fuzzy comprehensive evaluation and a backpropagation neural network are then used to evaluate and analyze the risk level. Finally, the risk assessment system is used to evaluate the risk for Line 5 of the Hangzhou Metro in China. Based on the evaluation results, adjustments to the slurry strength, grouting pressure, and soil chamber pressure are proposed, and the risk is mitigated effectively.
Subject
Civil and Structural Engineering
Reference18 articles.
1. An overview of the Seikan tunnel project
2. Nordic sub sea tunnel projects
3. Risk identification and handling during construction of subsea tunnel;Y. Wang;Chinese Journal of Underground Space and Engineering,2007
4. Influence of long-term partial drainageof shield tunnel on tunnel deformation and surface settlement;Y. Liu;Rock and Soil Mechanics,2013
5. Construction for water burst and collapse treatment in sand soil heading of Xiamen subsea tunnel;J. Tong;Subgrade Engineering,2010
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献