A Modern Approach to Analyzing the Flowing Pressures of a Two-Phase CBM and Water Column in Producing Wellbores

Author:

Liu Xinfu1ORCID,Liu Chunhua2ORCID,Wu Jianjun3

Affiliation:

1. School of Mechanical and Automotive Engineering, Qingdao University of Technology, Qingdao, 266520 Shandong, China

2. College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao, 266580 Shandong, China

3. PetroChina Coalbed Methane Co. Ltd., Xi’an, 710082 Shanxi, China

Abstract

A modern methodology is presented for the system analysis of flowing pressures in order to forecast the dynamic behavior and solve the forthcoming problems that emerge in two-phase coalbed methane (CBM) wellbores. The proposed methodology involves a numerical integration technique to calculate flowing pressures and pressure drops of CBM and water flow from the bottom hole to the well head. The methodology is validated against full-scale measured data in coalfields. The relationships developed match CBM reservoir behavior and wellbore conditions along the annulus with an overall accuracy of 1.13%. The computation of flowing pressures involves a liquid holdup and kinetic energy term with flow rate increments, a compressibility factor with depth increments, and a friction factor with Reynolds number. The flowing pressures of a two-phase column fully reflect the dynamic flowing performance due to the combined action of the water level, CBM, and water flow rates. The effect of CBM and water column pressures is more obvious than that of CBM column pressures. The pressure ratios of CBM and the water column to the bottom hole decline rapidly with the increase of the dynamic water level. CBM and water flow rates can be improved with increases in CBM and water column pressure for two-phase producing wellbores. The decrease of flowing pressures and increased increment of the pressure drop for the two-phase column are beneficial to CBM desorption and result in the increased CBM and water production. It will control the falling speed of the dynamic water level above CBM and the water column and enhance CBM reservoir productivity. The increases of CBM and water column pressure from 34.6 kPa to 922 kPa and the decreases of pressure in the bottom hole from 2.252 MPa to 1.328 MPa lead to the increases of the CBM flow rate from 3327 m3/d to 6721 m3/d.

Funder

Key Research Project of Shandong Province

Publisher

Hindawi Limited

Subject

General Earth and Planetary Sciences

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3