Pressure Law of Roof and Supporting Technology of Roadway When Working Face Passing through Abandoned Roadway

Author:

Pan Weidong1ORCID,Deng Cang1ORCID,Yang Yinchao1ORCID,Zhang Kunming1ORCID,Gao Shan1ORCID

Affiliation:

1. School of Energy and Mining Engineering, China University of Mining and Technology, Kailuan (Group) Limited Liability Corporation, 063000), Beijing 100083, China

Abstract

Unlike conventional long-wall mining, the roofing activity is more intense when the long-wall face passes through the abandoned roadway. Technically, the coal pillar between the abandoned roadway and the long-wall face will suddenly fail with a certain critical value of its width, leading to the roof breaks in advance and other production-restricted problems because of the support loss, which will be a great threat to underground mining activities. In order to guarantee safe mining conditions, it is a great necessity to uncover how the roof breaks in advance and how to deal with it. From the stability maintaining of the key block perspective, this study looked at research from the 12404–1 long-wall face of Wulanmulun coal mine, China. The critical value of the coal pillar’s width was determined to be about 4.75 m by theoretical analysis, and likely, the appropriate supporting force of the abandoned roadway’s roof is about 1073 kN per meter. In this study, a numerical simulation method was adopted to study the ground pressure when the long-wall face is passing through the abandoned roadway. Correspondingly, a compound supporting technology involving the roof presplit technique, anchor cable supporting, and pumping pillar supporting was proposed for the roof of the abandoned roadway, and it practically worked well.

Publisher

Hindawi Limited

Subject

Mechanical Engineering,Mechanics of Materials,Geotechnical Engineering and Engineering Geology,Condensed Matter Physics,Civil and Structural Engineering

Reference21 articles.

1. Several problems of the old mining remnants in longwall fully mechanized mining technology;Z. H Xu;Journal of China Coal Society,2015

2. Study on instability mechanism and top control of overfilled roof in fully mechanized caving face;Q. Y Xu;J Min Saf Eng,2019

3. Method for determining the load on and width of coal pillar at the recovery room end of fully‐mechanized longwall mining;S. C Gu;Journal of China University of Mining and Technology,2015

4. Mining methods and roof caving mechanism in longwall mining through the abandoned gateroads of small mines;Y Li;Journal of China Coal Society,2017

5. Stability analysis of un‐mined coal pillars during the pressure adjustment prior to long-wall face transfixion;S. C. Gu;J Min Saf Eng,2017

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3