Affiliation:
1. Department of Electrical Engineering, Shabestar Branch, Islamic Azad University, Shabestar, Iran
Abstract
The economic and resilient operation of power systems has always been one of the main priorities of energy systems. In spite of improvements in various fields of energy systems, especially power systems, the issue of resilience has become more important. For this purpose, this paper proposes a multiobjective optimization model to improve the economic performance of energy hub systems and improve the resilience of electrical consumers. Also, consumer welfare, which is a function of the energy not supplied index, is maximized over a 24-hour period by considering extreme weather conditions. The ε-constraint method is applied to solve the proposed model by transforming the multiobjective optimization problem into several single-objective optimization problems. The max-min fuzzy method is also used to select the optimal solution among the Pareto solutions. A sample hub system is made up of electrical, thermal, and gas loads, electrical and thermal energy sources, and storage systems employed as a test system. A group of actions is applied to improve the resilience of the system, which may be affected by outages caused by storms under the resilience response program (RRP). The results proved the efficiency of the proposed RRP in improving economics and resilience.
Subject
Electrical and Electronic Engineering,General Computer Science,Signal Processing
Reference31 articles.
1. IoT-Enabled Operation of Multi Energy Hubs Considering Electric Vehicles and Demand Response
2. Reliability-based operation in energy hubs with several energy networks;A. Malekijavan;Journal of Industrial Electronics, Control and Optimization Journal,2021
3. Bi-level operation scheduling of distribution systems with multi-microgrids considering uncertainties;S. Esmaeili;Multidisciplinary Digital Publishing Institute,2020
4. Reliability-Based Optimal Planning of Electricity and Natural Gas Interconnections for Multiple Energy Hubs
5. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献