Formation Mechanism and the Height of the Water-Conducting Fractured Zone Induced by Middle Deep Coal Seam Mining in a Sandy Region: A Case Study from the Xiaobaodang Coal Mine

Author:

Xie Xiaoshen12ORCID,Hou Enke12ORCID,Wang Shuangming12ORCID,Sun Xueyang12,Hou Pengfei12,Wang Shibin3,Xie Yongli4,Huang Yongan5

Affiliation:

1. College of Geology and Environment, Xi’an University of Science and Technology, Xi’an, Shaanxi 710054, China

2. Shaanxi Provincial Key Laboratory of Geological Support for Coal Green Exploitation, Xi’an, Shaanxi 710054, China

3. Shaanxi Coal Industry Company Limited, Xi’an, Shaanxi 710077, China

4. Shaanxi Xiaobaodang Mining Company Limited, Shenmu, Shaanxi 719302, China

5. SHCCIG Yubei Coal Industry Company Limited, Yulin, Shaanxi 719000, China

Abstract

The height of the water-conducting fractured zone (WCFZ) is a basic parameter related to water protection in coal mines and is also crucial for aquifer protection and mine safety. In order to accurately detect the height and shape and reveal the formation mechanism of the WCFZ, which is caused by middle-deep coal seam mining in a sandy region, the 112201 coalface at the 1# coal mine of Xiaobaodang was taken as a case study. Filed measurements including fluid leakage, borehole TV, and similar simulation were adopted to analyze the regularity of the WCFZ in this area. The detection results of field measurements showed that the maximum height of the WCFZ was 177.07 m in a borehole near the open-off cut, and the ratio of the height of the water-conducting fractured zone divided by the mining thickness was 30.53. The WCFZ acquired an inward-convergent saddle shape, which was inclined to the goaf. The saddle bridge was located at the boundary of the goaf, and the saddle ridge was located at the center of the goaf. Also, through analyzing the results of similar simulations, we found that, in the process of mining, separation cracks and the beam structure were the main forms of overburden disturbance transmitting upward and ahead of mining, respectively. The main cause of the increase in height of the WCFZ was the connection of the separation cracks and vertical cracks caused by fractures of beam structures. The development of the WCFZ was divided into five stages: incubation stage, development stage, rapidly increasing stage, slowly increasing stage, and stable stage. Moreover, the duration of each stage was related to the lithology and mining technology. This research can provide significant theoretical insights for the prediction of the WCFZ, enabling the prevention of water hazards on mine roofs and assisting with water resources protection.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3