Discrete Element Simulation Analysis of the Bending and Toppling Failure Mechanisms of High Rock Slopes

Author:

Meng Zhigang123,Hou Yongli14,Guo Longji2,Wang Fengnian2ORCID,Liu Kuiming2ORCID,Qi Gan5,Ma Juan5

Affiliation:

1. Liaoning Non-Ferrous Geological Exploration and Research Institute Co., Ltd., Shenyang 110000, China

2. School of Mechanics and Civil Engineering, China University of Mining & Technology, Beijing 100083, China

3. State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Beijing 100083, China

4. Technology Innovation Center of Old Mine Geological Disaster Prevention and Ecological Restoration Engineering, Ministry of Natural Resources, Beijing 100083, China

5. China Geological Environmental Monitoring Institute, Beijing 100081, China

Abstract

The high rock slope situated in the Southwest stope of Taiping Mining, Inner Mongolia, is subject to dumping failure due to its instability. The dumping body rock layer of this stope shows obvious bending and lowering of the head. The overturning angle of the rock strata can reach 46°, and tension dislocation along the rock joint can be observed in exposed sections and at the bedding and lithologic interface. The sliding surface also displays a broken line morphology. Through evaluation of regional rock integrity parameters and rock soft and hard parameters, rock-mass strength based on Hoek Brown strength estimation criteria can be developed. Based on the discrete element method, the geological model of layered excavation of the thin layer slope can be constructed. Combined with indoor and outdoor assessments, the characteristics of toppling deformation of the thin layer open-air slope can be studied and summarized. In this study, simulation analysis showed that under first excavation conditions, a crack-, dump-, and antislip zone was formed. The rock in the crack zone formed a “<”-shaped fracture along the slope surface that was squeezed towards the bottom of the slope. In the lower dumping area, the deflection angle gradually increased with excavation, and the deformation range and levels in the antislip area increased with excavation. Following the third excavation, the antisliding zone disappeared and the toppling line changed from a broken line to a straight line. In the final state, the slope collapsed as a whole, with the collapse of the dumping body penetrating the top to the foot of the slope.

Funder

Liaoning Science and Technology Project

Publisher

Hindawi Limited

Subject

General Earth and Planetary Sciences

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3