Displacement and Stress Characteristics of Tunnel Foundation in Collapsible Loess Ground Reinforced by Jet Grouting Columns

Author:

Li Youyun1,Xu Shuoshuo1,Liu Houquan12ORCID,Ma Enlin1,Wang Lixin3

Affiliation:

1. School of Highway, Chang’an University, Xi’an 710064, China

2. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, China

3. State Key Laboratory of Rail Transit Engineering Informatization, China Railway First Survey and Design Institute Group Co., Ltd., Xi’an 710043, China

Abstract

Collapsible loess tunnel foundation reinforcement is a new challenge in the construction process of tunnel engineering. According to the field displacement and stress monitoring of the Fujiayao loess tunnel, this paper investigates the reinforcing effect of a high-pressure jet grouting pile on a collapsible loess tunnel foundation in the deep large-span tunnel. The field monitoring method was employed to address the performance of tunnel foundation settlement, additional stress, earth pressure, rock pressure, etc. The results indicate that the stress on the pile tops and the earth pressure between piles increase gradually over time in two stages: stress increases rapidly in the first 45 days and, after this period, stress tends to gradually stabilize. Further, stress increases uniformly with the distance from the centerline of the tunnel, and the rock pressure of the tunnel sidewalls tends to be stable within two months of being constructed. Additional stress on the tunnel foundation increases linearly with time, and it is uniformly distributed in the vertical and horizontal directions of the tunnel section. Settlement of the tunnel foundation also gradually increases with time, and it tends to be stable at 50 days from the time of construction. Additionally, the settlements of different monitoring points are similar at the same depth. The research results will further improve the theoretical knowledge of tunnel bottom reinforcement in the loess tunnel, which not only can effectively guide the design and construction of the loess tunnel and reduce disease treatment cost but also can provide the necessary basic research data and scientific theoretical basis for revision of the corresponding specifications of highway tunnels and railway tunnels.

Funder

Western Traffic Science and Technology Project

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Cited by 50 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3