New Method to Design Coal Pillar for Lateral Roof Roadway Based on Mining-Induced Stress: A Case Study

Author:

Wang Feng12ORCID,Chen Shaojie12,Xu Jialin3ORCID,Ren Mengzi1

Affiliation:

1. State Key Laboratory of Mining Disaster Prevention and Control Co-Founded by Shandong Provence and the Ministry of Science and Technology, Shandong University of Science and Technology, Qingdao 266590, China

2. College of Mining and Safety Engineering, Shandong University of Science and Technology, Qingdao 266590, China

3. State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology, Xuzhou, Jiangsu 221116, China

Abstract

The traditional method to design coal pillar for lateral roof roadway was established based on the mining-induced strata movement contour which is considered as a straight line, while ignoring the variations of the internal strata deformation law as well as stress distribution characteristics. In order to make up for this deficiency, in this study, evolution of mining-induced stress in the overlying strata was simulated using physical and numerical simulations, and a method to design coal pillar for lateral roof roadway based on mining-induced stress was proposed. The results indicate that the stress of the overlying strata is redistributed during excavation, and the stress distribution can be divided into a stress-relaxation area, a stress-concentration area, and an in situ stress area. The contour line of 1.05 times the in situ stress is used to define the mining-induced stress contour. Stress inside the contour is redistributed while outside the contour the overlying strata are still within the in situ stress area. Mining-induced stress contour presents a concave-upward type from coal seam to the overlying strata that cannot be merged into a straight one due to their different characteristics of movement and deformation. With this in mind, this study proposed a method to design the width of coal pillar for lateral roof roadway according to the mining-induced stress contour. According to mining-induced stress contour, the width of coal pillar for lateral roof roadway of longwall panel 31100 is 160 m, and the maximum deformation of the roadway is 270 mm. The new method can definitely meet engineering demands.

Funder

Natural Science Foundation of Shandong Province

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Cited by 12 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3