Affiliation:
1. Logistics Engineering College, Shanghai Maritime University, 201306, Shanghai, China
2. School of Management, Shanghai University, 200444, Shanghai, China
Abstract
To reduce the inventory cost and ensure product quality while meeting the diverse demands of customers, manufacturers yield products in batches. However, the raw materials required for manufacturing need to be obtained from suppliers in advance, making it necessary to understand beforehand how to best structure the pickup routes so as to reduce the cost of picking up and stocking while also ensuring the supply of raw materials required for each batch of production. To reduce the transportation and inventory costs, therefore, this paper establishes a mixed integer programming model for the joint optimization of multibatch production and vehicle routing problems involving a pickup. Following this, a two-stage hybrid heuristic algorithm is proposed to solve this model. In the first stage, an integrated algorithm, combining the Clarke-Wright (CW) algorithm and the Record to Record (RTR) travel algorithm, was used to solve vehicle routing problem. In the second stage, the Particle Swarm Optimization (PSO) algorithm was used to allocate vehicles to each production batch. Multiple sets of numerical experiments were then performed to validate the effectiveness of the proposed model and the performance efficiency of the two-stage hybrid heuristic algorithm.
Funder
National Natural Science Foundation of China
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Research on the Scheduling Problem of Movie Scenes;Discrete Dynamics in Nature and Society;2019-02-03