Risk Priority Evaluation for Power Transformer Parts Based on Intuitionistic Fuzzy Preference Selection Index Method

Author:

Minglin Jiang1ORCID,Ren Haiping2ORCID

Affiliation:

1. School of Business, Minnan Normal University, Zhangzhou 363000, China

2. Teaching Department of Basic Subjects, Jiangxi University of Science and Technology, Nanchang 330013, China

Abstract

The risk assessment of power transformer equipment can not only improve the safety and management level of transformer operation, but also reduce the operation and maintenance costs of the equipment on the basis of ensuring the overall reliable operation of the power system. As a result, it can enhance the rewards of assets investment. The quantitative analysis of power equipment risk often contains qualitative indicators that are difficult to quantify. These indicators have the characteristics of fuzziness. In order to improve the accuracy and reliability of risk assessment results, this paper proposed a new risk evaluation method based on intuitionistic fuzzy set. Firstly, language variables are transformed into corresponding intuitionistic fuzzy numbers. Secondly, a novel entropy of intuitionistic fuzzy set is established. Thirdly, a weighting method for determining each expert’s importance is proposed based on the new propose entropy. Furthermore, an extended preference selection index is put forward under intuitionistic fuzzy environment. Finally, an example of the risk assessment of power transformer components is discussed to illustrate the effectiveness of the new risk evaluation method.

Funder

Chinese National Funding of Social Sciences

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Reference35 articles.

1. Comprehensive condition assessment of power transformer based on asymmetric nearness degree evidence cloud matter-element model;H. B. Yu;Power System Technology,2020

2. Research on fuzzy evaluation method for comprehensive state of transformer;J. L. Wang;Transformer,2021

3. A differentiated evaluation method of transformers considering the part and its performances;P. Zhang;Proceedings of the CSEE,2019

4. Risk assessment method of power transformer based on fuzzy decision-making;Y. Y. Wang;Chinese Journal of Scientific Instrument,2009

5. Application of fuzzy analytic hierarchy process and neural network in power transformer risk assessment

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3