Affiliation:
1. School of Business, Minnan Normal University, Zhangzhou 363000, China
2. Teaching Department of Basic Subjects, Jiangxi University of Science and Technology, Nanchang 330013, China
Abstract
The risk assessment of power transformer equipment can not only improve the safety and management level of transformer operation, but also reduce the operation and maintenance costs of the equipment on the basis of ensuring the overall reliable operation of the power system. As a result, it can enhance the rewards of assets investment. The quantitative analysis of power equipment risk often contains qualitative indicators that are difficult to quantify. These indicators have the characteristics of fuzziness. In order to improve the accuracy and reliability of risk assessment results, this paper proposed a new risk evaluation method based on intuitionistic fuzzy set. Firstly, language variables are transformed into corresponding intuitionistic fuzzy numbers. Secondly, a novel entropy of intuitionistic fuzzy set is established. Thirdly, a weighting method for determining each expert’s importance is proposed based on the new propose entropy. Furthermore, an extended preference selection index is put forward under intuitionistic fuzzy environment. Finally, an example of the risk assessment of power transformer components is discussed to illustrate the effectiveness of the new risk evaluation method.
Funder
Chinese National Funding of Social Sciences
Subject
General Engineering,General Mathematics
Reference35 articles.
1. Comprehensive condition assessment of power transformer based on asymmetric nearness degree evidence cloud matter-element model;H. B. Yu;Power System Technology,2020
2. Research on fuzzy evaluation method for comprehensive state of transformer;J. L. Wang;Transformer,2021
3. A differentiated evaluation method of transformers considering the part and its performances;P. Zhang;Proceedings of the CSEE,2019
4. Risk assessment method of power transformer based on fuzzy decision-making;Y. Y. Wang;Chinese Journal of Scientific Instrument,2009
5. Application of fuzzy analytic hierarchy process and neural network in power transformer risk assessment
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献