Assessment of Contractor’s Extension of Time Claim (Eot)

Author:

Ahmed Neveen Asaad Saleh

Abstract

Project Management tools and techniques are simply the process of coordinating the contractor's resources to achieve the Employer's Target. Each project has its own level of project management tailored to the project unique case. In project initiation stage, various inputs drive the main project key assumptions relevant to Project Scope, Duration, Cost and Stakeholders. Those same assumptions could impose a reason for the contractor not to meet project completion date and to be titled as causes of delay or Delay Events. Some of you might understand that since the topic is Time Extension Claim, so we focus on project timeline, this is correct, and within this, we will explain why the "Project Programme of Work (Baseline)" where assigned resources, cost, quantities, and sequence of work will drive Project Progress need to be agreed. Regardless the debate of whither or whither-not, the Baseline is a contractual document, and it requires approval or not, this paper assumes that; the contractor has signed the contract, secured approved programme, and managed to follow all contract clauses to submit a proper extension of time claim. Hence, he/she is concerned about the Contract Administrator action upon receiving this claim, methods of delay analysis, and determination report contents.

Publisher

Qatar University Press

Reference7 articles.

1. 1. AACE International Recommended Practice NO. 29R-03- FORENSIC SCHEDULE ANALYSIS - TCM Framework: 6.4-Forensic Performance Assessment

2. 2. FIDIC; Conditions of Contract for Plant & Design and Build (2017). 2nd Edition; International Federation of Consulting Engineers.

3. 3. Gibson, R. (2008). 1st Edition Construction Delays Extensions of Time and Prolongation claims; Routledge Tylor & Francis Group. USA.

4. 4. Hewitt, A. (2016). 2nd Edition. Construction Claims & Responses Effective Writing & Presentation, Wiley Blackwell, UK.

5. 5. Khlousy, M. M. & Kandil, H. M. (2018). 1st Edition. Claims in Construction & FIDIC Contracts- Arab arbitration Centre- Egypt.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3