Top-Down Construction Method: A Case Study For Underpass Structure in Qatar

Author:

Kara Ali,Chelliah Anbalagan,Tzaveas Theodoros

Abstract

The Cut and Cover construction method has been applied to build several underpass structures within the expressway programme of the Highway Projects Department, Public Works Authority, Qatar. Booming in the construction industry contributes to increasing existing traffic in Qatar. This subsequently failed existing road junctions and required updating the road network parallel to the traffic studied. Underpasses and bridges were planned across many locations in Qatar to increase the level of service at road junctions, enhance the traffic capacity, reduce traffic congestion, and improve the free flow of traffic. This paper discusses the design and construction challenges of the underpass structure constructed by top-down construction method located on D ring Road in Doha, Qatar. The top-down construction method has been suggested by the construction contractor as an alternative to the conventional cut-and-cover construction method to minimize the traffic disruption and meet updated temporary traffic management (TTMs) due to underpass construction works, restore traffic at the junction on top of the underpass prior to the completion of construction works and overall optimize the construction duration. A numerical modelling research was carried out to study the change in arrangements. The site-specific challenges, such as modification in the structural arrangement of the underpass, change in ground conditions, lateral displacement of pile walls and dewatering challenges, are discussed in this paper.

Publisher

Qatar University Press

Reference8 articles.

1. 1. Basarkar S. S. et al. (2010). 'Emerging Trend in Deep Basement Construction: Top-Down Technique', IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), ISSN: 2278-1684, PP: 01-11.

2. 2. Gaba, A. et al. (2017). 'CIRIA C760 Guidance on Embedded Retaining Wall Design', CIRIA, London.

3. Study on deformation law of deep foundation pit with the top-down method and its influence on adjacent subway tunnel;Gui;Advances in Civil Engineering,2020

4. 4. Hossein, Z. S & Mirmohamadi S. & Mostafa (2018). 'Top-Down Construction Method: A Case Study of Commercial Building', 11th International Congress on Civil Engineering May 2018, University of Tehran, Iran.

5. Top-down construction and its implications;Marchant;Proceedings of the Institution of Civil Engineers - Geotechnical Engineering,1994

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3