1. A. Warczok, G. Riveros, C. Diaz and E. Almendras, “Optimisation of Slag Cleaning,” Internal Report, 1997, Universidad de Chile, Departamento de Ingenieria de Minas, (Visit to the La Caridad Smelter. In Spanish).
2. A. Warczok et al. “Decopperizing of Slag from Direct Copper Smelting in Flash Smelter,” Internal Report, 1987, University of Mining and Metallurgy, Faculty of Non-Ferrous Metals, Cracow, Poland, (In Polish).
3. A.G. Hunt, S.K. Day, R.G. Shaw and R.C. West; “Development in direct-to-blister smelting at Olympic Dam”, Fourth International Conference COPPER99-COBRE99, 1999, vol. V, Smelting Operations and Advances, ed. D.B.George et al. , TMS, Warrendale, Pa. pp. 239–280.
4. A.A. Tseidler, “Copper and Nickel Metallurgy”, Metalurgizdat, 1958, Moscow, (In Russian).
5. T. Utigard, C. Diaz, E. Almendras, G. Sanchez and J. Manriquez, “Estudio de Fenómenos Basicos Inherentes al Proceso Teniente de Limpieza de Escorias” (Basic Phenomena Relating to the El Teniente Slag Cleaning Process), FONDECYT Project, 1996, Universidad de Chile, Departamento de Ingenieria de Minas, Santiago, (In Spanish).