1. Use of Twinned Drillholes in Mineral Resource Estimation
2. Abzalov MZ. 2011. Geostatistical approach for estimation sampling precision, Proc. 5th World Int. Sampling Conf., Santiago, Chile, October, 243–250.
3. Abzalov MZ. 2012. Optimisation grade control procedures at the open pit mines considering samples quality, drill spacing and the project economics, Abstracts of 34th International Geological Congress 2012 (IGC 34), Brisbane, Australia, August, IGC.
4. Abzalov MZ, Bower J. 2009. Optimisation of the drill grid at the Weipa bauxite deposit using conditional simulation, Proc. 7th Int. Min. Geol. Conf., 247–251, Melbourne, AusIMM.