Schedule Estimates for Preconstruction Activities of Highway Projects-Review of The Literature

Author:

Saeedi Mohammad Hossein,Nejat Ali,Smith Milton

Abstract

Among the multiple causes of project success in construction of big projects (such as highway projects), punctually delivering of preconstruction activities is increasingly recognized as a quite frequent cause that has not received adequate amount of attention. In this research, after providing an introduction about the different phases and activities in a construction project, the reasons behind the importance of preconstruction activities is briefly summarized. Scheduling of these types of activities is complex in nature mostly because of the unclear path toward delivering them; therefore, inaccurate scheduling of them is common. Since it is a very demanding and difficult responsibility to organize the literature efficiently, the literature is classified into five different groups to accelerate this effort; These groups are environmental clearance, design, right-of-way acquisition, utility adjustment, and finally advertising and letting; In this research, these categories and their definitions are provided in detail. After conducting a comprehensive literature review, the results of this study show that there is a lack of a quantitative model for predicting schedules associated with various preconstruction activities. Beside many other causes behind this need, the main reason is that the approach of most of the previous studies was qualitative and the few ones that have conducted a quantitative research on historical data had a small sample size.

Publisher

Bentham Science Publishers Ltd.

Subject

Transportation,Modeling and Simulation

Reference47 articles.

1. Elazouni AM, Gab-Allah AA. Finance-Based Scheduling of Construction Projects Using Integer Programming. J Constr Eng Manage 2004; 130 (1) : 15-24.

2. Waters T. Innovative Practices to Reduce Delivery Time for Right-of-Way in Project Development 2000.

3. General Accounting Office [GAO]. Preliminary Information on the Timely Completion of Highway Construction Projects. GAO 2002.

4. AASHTO. Strategic Plan Strategy 4-4: Right of Way and Utility Guidelines and Best Practices 2004. https://www.fhwa.dot.gov/programadmin/suebibli.cfm

5. Federal Highway Administration [FHWA]. Utility Involvement in South Carolina Design-Build Projects 1999. http://www.fhwa.dot.gov/programadmin/contracts/scdb.cfm

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3