Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects

Author:

De Marco Alberto,Narbaev Timur

Abstract

Aims: This study illustrates the main factors that influence the cost overruns and schedule delays of tunnel construction megaprojects. Objective: An empirical analysis was carried out based on a dataset collected from a number of recent tunnel megaprojects worldwide. Methods: Analyses of variances and regression analyses were conducted to infer statistical significance and understand the relationships that exist between cost overruns, time delays and variables of context, technical, and governance characteristics of the sample projects. Results: The most significant factors are those related to the complexity of infrastructure and the type of contracting system used to deliver the project. In particular, some technical characteristics pertinent to the size of the tunnel reveal to be influencing factors of both schedule delay and cost overrun, while the usage of a traditional contracting mechanism is likely to impact the cost overrun. The type of infrastructure, region, ownership, and funding scheme are not found to be statistically significant determinants of cost and time performance. Conclusion: This analysis reaffirms that the size and complexity are important factors of typical low performance of tunnel construction megaprojects. The results of this study can be used for strategic design and planning by decision-makers, project managers and designers.

Publisher

Bentham Science Publishers Ltd.

Subject

Civil and Structural Engineering

Reference51 articles.

1. Judgev K, Müller R. A retrospective look at our evolving understanding of project success. Proj Manage J 2005; 36 (4) : 19-31.

2. Cantarelli CC, Flybjerg B, Molin EJE, van Wee B. Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. Eur J Transp Infrastruct Res 2010; 10 (1) : 5-18.

3. Müller R, Judgev K. Critical success factors in projects: Pinto, Slevin, and Prescott – The elucidation of project success. Int J Managing Proj Bus 2012; 5 (4) : 757-75.

4. Lehtonen P, Martinsuo M. Three ways to fail in project management: The role of project management methodology. Proj Perspect 2006; XXVIII (1) : 6-11.

5. Brookes NJ, Locatelli G. Power plants as megaprojects: Using empirics to shape policy, planning, and construction management. Util Policy 2015; 36 : 57-66.

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3