Abstract
A comparison of predicted and measured performance of the bi-directional Islay Wells air turbine is presented. Reasonable agreement was evident for pressure, converted power and efficiency, at lower flowrates. For higher flowrates larger discrepancies were evident due to limitations in the theory, inaccuracies in experimental measurement and flow separation at the Islay turbine. It was concluded that improvement could be achieved through streamlining of the flow through the turbine, in order to defer turbine stall at the higher flowrates and to also improve flowrate measurement. Improvements are necessary in the measurement of flowrate and power conversion, and in the prediction technique.
Subject
Mechanical Engineering,Energy Engineering and Power Technology
Reference19 articles.
1. Mollinson D. The UK wave power resource. IMechE Seminar on Wave energy, London, 28 November 1991, No. 6, pp. 1–6 (Mechanical Engineering Publications, London).
2. World progress in wave energy—1988
3. Wave energy: Some questions and answers
4. Power From Water Waves
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献