1. Zhang Y. Research on Information Integration and Management of Construction Engineering Based on BIM. Tsinghua University, 2009.
2. Zhang J.P. Fan C. Wang Y.L. & Huang C.G(2011). Dynamic management of construction resources and real-time cost monitoring based on 4D-BIM. Construction Technology (04) 37-40.
3. Niu B. Application of BIM technology in project schedule management. Chongqing University, 2012.
4. Discussion on the application of BIM technology in 4D construction schedule simulation;Wang T;Journal of Graphics,2015
5. Nazar M, Shi JY, Jiang L, Pan ZY, Yang HT, (2022). BIM and ontology-based review of building irregularity types. Journal of Graphics (05), 918-926.