1. Hu, L.X., Zhong, D.H., and Tong, D.W. 2012. Simulation and real-time control of whole construction progress of long-distance diversion tunnels under unfavorable geological conditions. Chinese Journal of Geotechnical Engineering, 34, 3(2012), 497--503.
2. Zhong D.H., and Liu K. J. 2007. Schedule forecasting and control based on real time simulation of underground structure group construction. Journal of Tianjin University, 40, 6(2007), 721--725.
3. Li, J.R., Zhong, D.H., and Liu D.H., et al. 2006. Methodology and application of three-dimensional dynamic visual simulation of hydraulic and hydroelectric engineering. J. Sys. Simul., 18, 1(2006), 116--119.
4. Shi, Z., Q., Gao L.L., and Zhang L. 2012. Simulation model of deep buried diversion tunnel construction. Yellow River, 34, 10(2012), 141--143.
5. Xu, J., and Zhang O. 2017. Research on construction schedule management based on BIM technology. Procedia Engineering, 17, 4(2017), 657--667.