1. Attaran, M. (2004). Exploring the relationship between information technology and business process reengineering. Information & management, 41(5), 585--596. DOI= https://doi.org/10.1016/S0378-7206(03)00098-3
2. Ben, U. C., Henry, U. C., & Iriaoghuan, A. I. (2015). Design and Implementation of Online Clearance System: A Case Study of Imo State University. European Journal of Applied Sciences, 7(1), 25--31.DOI= https://10.5829/idosi.ejas.2015.7.1.1128
3. BPM (FPG-FLOW). (2016). Retrieved May 18, 2019, from http://www.efpg.com.tw/ftc/zhtw/products/BPM_Flow.do.
4. Brock Jr, J. L., Finedore, J. P., & Davis, D. A. (1997). Business Process Reengineering Assessment Guide. DIANE Publishing.
5. Chen, M., Zhang, D., & Zhou, L. (2007). Empowering collaborative commerce with Web services enabled business process management systems. Decision Support Systems, 43(2), 530--546. DOI= https://doi.org/10.1016/j.dss.2005.05.014