Affiliation:
1. Amity University, NOIDA UP, India
Abstract
Every software development project is unique and different from repeatable manufacturing process. Each software project share different challenges related to technology, people and timelines. If every project is unique, how project manager can estimate project in a consistent way by applying his past experience. One of the major challenges faced by the project manager is to identify the key software metrics to control and monitor the project execution. Each software development project may be unique but share some common metric that can be used to control and monitor the project execution. These metrics are software size, effort, project duration and productivity. These metrics tells project manager about what to deliver (size), how it was delivered in past (productivity) and how long will it take to deliver with current team capability (time and effort). In this paper, we explain the relationship among these key metrics and how they statistically impact each other. These relationships have been derived based on the data published in book "Practical Software Estimation" by International Software Benchmarking Group. This paper also explains how these metrics can be used in predicting the total number of defects. Study suggests that out of the four key software metrics software size significantly impact the other three metrics (project effort, duration and productivity). Productivity does not significantly depend on the software size but it represents the nonlinear relationship with software size and maximum team size, hence, it is recommended not to have a very big team size as it might impact the overall productivity. Total project duration only depends on the software size and it does not depend on the maximum team size. It implies that we cannot reduce project duration by increasing the team size. This fact is contrary to the perception that we can reduce the project duration by increasing the project team size. We can conclude that software size is the important metrics and a significant effort must be put during project initiation phases to estimate the project size. As software size will help in estimating the project duration and project efforts so error in estimating the software size will have significant impact on the accuracy of project duration and effort. All these key metrics must be re-calibrated during the project development life cycle
Publisher
Association for Computing Machinery (ACM)
Reference7 articles.
1. ISBSG "The Benchmark data for Software estimation" Release 10 (2011) ISBSG "The Benchmark data for Software estimation" Release 10 (2011)
2. QSM Software Almanac Application Development Series. 2014 Research Edition. QSM Software Almanac Application Development Series. 2014 Research Edition.
3. Impact of Size and Productivity on Testing and Rework Efforts for Web-based Development Projects
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. The Role of Virtual Reality Technology in Knowledge Acquisition: A Systematic Review;2024 IEEE 7th International Conference on Advanced Technologies, Signal and Image Processing (ATSIP);2024-07-11
2. A Reflection on the Use of Systemic Thinking in Software Development;Proceedings of the 18th International Conference on Evaluation of Novel Approaches to Software Engineering;2023
3. Significant strategies to assess software effort estimation: A view of functional point;i-manager’s Journal on Software Engineering;2023
4. A Statistical Model to Assess the Team’s Productivity in Agile Software Teams;2021 IEEE 4th International Conference and Workshop Óbuda on Electrical and Power Engineering (CANDO-EPE);2021-11-17
5. How Do Brazilian Software Development Teams Deal with Working From Home After a Year of the COVID-19 Pandemic?;Brazilian Symposium on Software Engineering;2021-09-27