Software projects are failing because of the poor project planning and due to this estimation have gained interest in recent times. Estimation process reduces the risk around schedule and cost. Effective software project estimation is one of the most challenging activities in software development that software industries are facing. Proper project planning and control is not possible without a reliable estimate.
Top down
and
bottom up
are traditionally the most commonly used techniques to estimate the effort of the software project. Studies suggest that the software companies should use Bottom up approach unless they have a vast experience from the similar projects. The goal of this research work is to extend the existing bottom up approach to achieve greater precision in the estimates. This work proposes the use and concepts of fuzzy set theory to extend the Bottom up approach to Fuzzy bottom up approach. With the productivity rate generated by fuzzy bottom up, derived values such as effort of development can be more precisely determined.
Publisher
Association for Computing Machinery (ACM)
Reference14 articles.
1. Estimating software projects
2. Internal Document on Methodologies https://www.accenture.com. Internal Document on Methodologies https://www.accenture.com.
3. Architecture-Centric Software Project Management A Practical Guide;Paulish D. J;Addison-Wesley, ISBN -
4. Top-down and bottom-up expert estimation of software development effort
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献