1. S. Karki y B. Hadikusumo, «Machine learning for the identification of competent project managers for construction projects in Nepal» , Construction Innovation , vol. 23 , n.o 1, pp. 1 - 18 , 2023 , doi: 10.1108/CI-08-2020-0139. 10.1108/CI-08-2020-0139 S. Karki y B. Hadikusumo, «Machine learning for the identification of competent project managers for construction projects in Nepal», Construction Innovation, vol. 23, n.o 1, pp. 1-18, 2023, doi: 10.1108/CI-08-2020-0139.
2. L. Chen , Q. Lu , y D. Han, «A Bayesian-driven Monte Carlo approach for managing construction schedule risks of infrastructures under uncertainty» , Expert Systems with Applications , vol. 212 , 2023 , doi: 10.1016/j.eswa.2022.118810. 10.1016/j.eswa.2022.118810 L. Chen, Q. Lu, y D. Han, «A Bayesian-driven Monte Carlo approach for managing construction schedule risks of infrastructures under uncertainty», Expert Systems with Applications, vol. 212, 2023, doi: 10.1016/j.eswa.2022.118810.
3. A. Celoza , D. P. De Oliveira , y F. Leite, «Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects» , Journal of Legal Affairs and Dispute Resolution in Engineering and Construction , vol. 15 , n.o 2, 2023 , doi: 10.1061/JLADAH.LADR-916. 10.1061/JLADAH.LADR-916 A. Celoza, D. P. De Oliveira, y F. Leite, «Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects», Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 15, n.o 2, 2023, doi: 10.1061/JLADAH.LADR-916.
4. A. E. Muller , «The effect of machine learning tools for evidence synthesis on resource use and time-to-completion: protocol for a retrospective pilot study» , Systematic Reviews , vol. 12 , n.o 1, 2023 , doi: 10.1186/s13643-023-02171-y. 10.1186/s13643-023-02171-y A. E. Muller , «The effect of machine learning tools for evidence synthesis on resource use and time-to-completion: protocol for a retrospective pilot study», Systematic Reviews, vol. 12, n.o 1, 2023, doi: 10.1186/s13643-023-02171-y.
5. Z. T. Kosztyán , G. Novák , R. Jakab , I. Szalkai , y C. Hegedűs, «A matrix-based flexible project-planning library and indicators» , Expert Systems with Applications , vol. 216 , 2023 , doi: 10.1016/j.eswa.2022.119472. 10.1016/j.eswa.2022.119472 Z. T. Kosztyán, G. Novák, R. Jakab, I. Szalkai, y C. Hegedűs, «A matrix-based flexible project-planning library and indicators», Expert Systems with Applications, vol. 216, 2023, doi: 10.1016/j.eswa.2022.119472.