1. D. Cichos and J.C. Aurich . 2015. Planning and controlling of multiple, parallel engineering changes in manufacturing systems. Elsevier B.V . 9th CIRP Conference on Intelligent Computation in Manufacturing Engineering , Dec. 2015 , 81 – 86. https://doi:10.1016/j.procir.2015.06.016 D. Cichos and J.C. Aurich. 2015. Planning and controlling of multiple, parallel engineering changes in manufacturing systems. Elsevier B.V. 9th CIRP Conference on Intelligent Computation in Manufacturing Engineering, Dec. 2015, 81 – 86. https://doi:10.1016/j.procir.2015.06.016
2. M. F. Zaeh L. Papadakis and M. Langhorst. 2008. Simulation of the manufacturing process chain of welded frame structures. Computer aided engineering. 33 6 (July 2008) 385–393. https://doi: 10.1007/s11740-008-0122-4 M. F. Zaeh L. Papadakis and M. Langhorst. 2008. Simulation of the manufacturing process chain of welded frame structures. Computer aided engineering. 33 6 (July 2008) 385–393. https://doi: 10.1007/s11740-008-0122-4
3. Guillermo Gallego , Material Requirements Planning (MRP) . 2004 . IEOR 4000: Production Management . Guillermo Gallego, Material Requirements Planning (MRP). 2004. IEOR 4000: Production Management.
4. Manuel Díaz-Madroñero , Josefa Mula and Mariano Jiménez . 2015 . Material Requirement Planning under Fuzzy Lead Times. Elsevier Ltd . IFAC International Federation of Automatic Control, May. 2015, 242–247. https://doi:10.1016/j.ifacol.2015.06.088. Manuel Díaz-Madroñero, Josefa Mula and Mariano Jiménez. 2015. Material Requirement Planning under Fuzzy Lead Times. Elsevier Ltd. IFAC International Federation of Automatic Control, May. 2015, 242–247. https://doi:10.1016/j.ifacol.2015.06.088.
5. Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations