1. Zrojchikov N.A., Gorburov D.V. Comprehensive justification for expired service life drum replacement. Radioelektronika, elektrotekhnika i energetika: tezisy dokladov XVII Mezhdunarodnoj nauchno-tekhnicheskoj konferencii studentov i aspirantov = Radioelectronics, electrical engineering and power engineering: report abstracts of the 17th International scientific and technical conference of students and postgraduate students. 2 March 2017, Moscow. Mos-cow: Moscow Power Engineering Institute; 2011, vol. 3, р. 98. (In Russ.).
2. Baidakova N.V., Afonin A.V., Blagochinnov A.V. Devel-opment of an implementation algorithm of CHP steam boiler and turbine repair program based on technical condition of power equipment. Nadezhnost' i bezopasnost' energetiki = Safety and Reliability of Power Industry. 2021;14(1):40-44. (In Russ.). https://doi.org/10.24223/1999-5555-2021-14-1-40-44.
3. Popov A.B. On service life limits of power equipment. Energetik. 2021;2:8-14. (In Russ.). https://doi.org/10.34831/EP.2021.18.78.002.
4. Fedorov A.I., Petrov I.P., Tobol' D.A. Analysis of the in-fluence of inter-boiler device design and state on drum boiler operation reliability. Elektricheskie stantsii. 2006;6:65-73. (In Russ.).
5. Larkin I.S., Ovchinnikova S.M. An analysis of separation principles in boilers in terms of energy efficiency. Ogarev-Online. 2014;23. Available from: https://cyberleninka.ru/ar-ticle/n/analiz-printsipov-separatsii-v-kotloagregatah-s-tochki-zreniya-energeticheskoy-effektivnosti [Accessed 12th March 2022]. (In Russ.).