Determination of optimal oil pumping plans
-
Published:2022-03-15
Issue:1
Volume:320
Page:15-24
-
ISSN:2224-5243
-
Container-title:Kompleksnoe Ispolʹzovanie Mineralʹnogo syrʹâ/Complex Use of Mineral Resources/Mineraldik Shikisattardy Keshendi Paidalanu
-
language:
-
Short-container-title:KIMS/CUMR/MShKP
Author:
Bekibayev T.ORCID,
,
Ramazanova G.ORCID,
Pakhomov M.,
Bosinov D.ORCID,
,
,
,
,
Abstract
This paper presents the results of determining the optimal plans for pumping oil through the main oil pipelines of Kazakhstan. The calculation methodology is based on determining the minimum unit cost of pumping depending on oil flow rate. Oil pumping energy-saving modes are determined under optimal operating conditions of pumping units and heating furnaces at stations. Determination of the optimal pumping plan is implemented as a separate module of the SmartTranPro software. Pumped oil volumes on the oil pipeline sections were determined on the basis of the automated system of control and metering of electrical energy data of KazTransOil JSC. Optimal pumping plans for monthly oil volumes in the Kalamkas – Karazhanbas and Dzhumagaliev – Atasu pipeline sections for cold and warm periods were calculated on the basis of the found dependence of the pumping unit cost. For each range of oil mass flow rate, specific costs for oil pumping and a list of operating pumps at oil pumping stations located along the pipeline section are indicated.
Publisher
Institute of Metallurgy and Ore Benefication (Publications)