Justifi cation of economic effi ciency of state investments in capital construction facilities

Author:

Karakozova I. V.ORCID, ,Prokhorova Yu. S.ORCID, ,

Abstract

Modern investment and construction activities in the Russian Federation in the current paradigm of providing a comfortable environment for human life should provide continuous creation (improvement) of the infrastructure of the territory. Every year, at the state level, investment programs are created, refl ecting the priority areas of construction and financed from the state budget. But the problems existing because of worsening of the quality of the construction production, not always high level of qualification of executors and necessary construction and investment control on all stages of life cycle of the object of capital construction have led to necessity to create the system that stipulates setting limits of budget obligations to cover existing risks and fulfill investment project in due time. To solve the stated problem, the subject area of the study is defined. The subject of the research: the process of formation of the cost of the object of capital construction. The aim of the research: creation of the mechanism for determining the economic effi ciency of public investments, depending on the emerging risks in the process of implementation of the object of capital construction throughout the life cycle. Research objectives: to develop a methodical approach to justify the basic principles and concepts associated with the system of formation of budget limit and reserves of funds for contingencies and costs in determining the cost of construction; to develop proposals for improving Russian legislation. Research methods: analysis and synthesis, graphic modeling, comparative estimates. Research results: a mechanism for determining the economic effi ciency of public investments depending on the coeffi cient of budgetary obligation limits, taking into account the size of the reserve funds for contingency work and costs at the stages of the life cycle of the object of capital construction when implementing the investment project. Scope of application of the results: the introduction of the mechanism for determining the economic efficiency of public investment in the activities of the Ministry of Construction, Housing and Communal Services of the Russian Federation, at the territorial level — in the activities of the executive authorities to plan and provide investment programs.

Publisher

PANORAMA Publishing House

Subject

Music,Ecology, Evolution, Behavior and Systematics,History,General Medicine,Ophthalmology,General Medicine,Pharmaceutical Science,Political Science and International Relations,Sociology and Political Science,Political Science and International Relations,Sociology and Political Science,Sociology and Political Science,Plant Science

Reference33 articles.

1. 1. AACE Headquarters. (2022). AACE International Recommended Practice No. 56R-08 Cost estimate classifi cation system - as applied in engineering, procurement, and construction for the building and general construction industries. TCM Framework: 7.3 - Cost Estimating and Budgeting. - Available at: https://web.aacei. org/docs/default-source/toc/toc_56r-08.pdf?sfvrsn=4 (accessed: 01.05.2022).

2. 2. AACE Headquarters. (2022). AACE International Recommended Practice No. 18R-97 Cost estimate classifi cation system - as applied in engineering, procurement, and construction for the process industries. TCM Framework: 7.3 - Cost Estimating and Budgeting. - Available at: https://web.aacei.org/docs/default-source/toc/toc_18r-97.pdf?sfvrsn=4 (accessed: 01.05.2022).

3. 3. City of Seattle. (2017). Seattle Public Utilities. 2017 Cost Estimating Guide. - Available at: https://www.seattle. gov/util/cs/groups/public/@spu/@engineering/documents/webcontent/02_015864.pdf (accessed: 10.06.2022).

4. 4. Mubarak, I. (2012). How to estimate with RSMeans data: Basic Skills for Building Construction. Fourth ed. Published by John Wiley & Sons, Inc., Hoboken, New Jersey. 416 p.

5. 5. RSMeans Building Construction Cost Data 2014. 72nd Edition by R. S. Means Company. 946 p.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3