Cost management as a key component of the organizational system of a developer implementing a unique nuclear industry infrastructure project abroad
-
Published:2022-11-18
Issue:11
Volume:
Page:788-803
-
ISSN:
-
Container-title:Mezhdunarodnaja jekonomika (The World Economics)
-
language:
-
Short-container-title:The World Economics
Author:
Karakozova I. V.ORCID, , Prokhorova Yu. S.ORCID, Zyablov V. A., ,
Abstract
The COVID-19 pandemic and the global economic crisis did not lead to a collapse in the volume of construction work in the country and abroad, as well as a decrease in investment in infrastructure projects. However, the labor force was negatively affected (both quantitatively and qualitatively), industry prices, supply chains and the stability of companies. The low profi tability of the Russian sector of construction of infrastructure projects remains unattractive for capital investment by businesses and investment funds, and therefore, private companies have been selling their construction assets to state-owned companies or monopolies for 5 years (from 2018–2022). Also, for the participants in the implementation of infrastructure projects, the most serious problems remain imperfections in the public procurement system and the formation of project costs, an outdated pricing model, high cost and limited availability of loans, as well as the inability to plan their load for a long time. Almost all of these problems are somehow interconnected with each other, and they need to be addressed with the help of systemic transformations. Even if a large amount of funds is directed to infrastructure projects, it will only postpone the need for systemic changes in the industry in general and organizational changes at the level of the developer in particular. To solve the stated problem, the subject area of the study is defi ned: the subject of the research: the process of organizing the cost management of an infrastructure project of the nuclear industry abroad; the aim of the research: creation of a scheme of the developer’s organizational process for managing the cost of construction of an infrastructure project of the nuclear industry (IPAO) abroad; research objectives: develop a methodological approach to substantiate each stage of the implementation of a unique infrastructure project of the nuclear industry in terms of the processes of formation, calculation, approval, control and monitoring of cost; develop proposals for improving the cost management process by the customer when implementing a unique infrastructure project for the nuclear industry abroad. Research methods: analysis and synthesis, graphic modeling, comparative estimates; research results: the created scheme of the developer’s organizational process for managing the cost of construction of an infrastructure project of the nuclear industry (IPAO) abroad at the stages of project implementation, taking into account the process approach and refl ecting the responsibility of counterparties at each stage of the life cycle. Scope of application of the results: the introduction of the organizational process scheme into the activities of companies implementing infrastructure projects abroad will allow regulating and standardizing cash fl ow processes, as well as identifying deviation parameters of the established cost throughout the life cycle of the infrastructure project.
Publisher
PANORAMA Publishing House
Subject
Biomedical Engineering,General Medicine,Electrical and Electronic Engineering,Electrical and Electronic Engineering,Hardware and Architecture,Electronic, Optical and Magnetic Materials,Electrical and Electronic Engineering,Computer Networks and Communications,Electrical and Electronic Engineering,Atomic and Molecular Physics, and Optics,Electrical and Electronic Engineering,Signal Processing,Electrical and Electronic Engineering,General Computer Science,Engineering (miscellaneous),Pharmacology (medical),General Biochemistry, Genetics and Molecular Biology,Medicine (miscellaneous),General Engineering,Engineering (miscellaneous)
Reference20 articles.
1. 1. Order of the Government of the Russian Federation of August 14, 2019 Nо. 1797-r (as amended on May 13, 2021). - Available at: http://www.consultant.ru/document/cons_doc_LAW_331686/ (accessed: 02.08.2022) (in Russian). 2. 2. Approved by order of the Ministry of Construction and Housing and Communal Services of the Russian Federation dated June 15, 2020 No. 317/pr. - Available at: https://www.minstroyrf.gov.ru/upload/iblock/f30/Metodika-317_pr (accessed: 25.09.2022) (in Russian). 3. 3. Methodology and processes. Industry Center for Capital Construction (OCKS). - Available at: http://tcmnc.ru/about/methodology-and-processes/ (accessed: 05.08.2022) (in Russian). 4. 4. Prokhorova, Yu. S. (2020). Kompleksnyi podkhod k upravleniiu stoimost'iu stroitel'stva ob»ekta v usloviiakh gosudarstvennogo investirovaniia [An integrated approach to managing the cost of building an object in the conditions of state investment]. Ekonomika i upravlenie [Economics and Management]. Vol. 26, No. 8, pp. 861-872. http://doi.org/10.35854/1998-1627-2020-8-861-872 (in Russian). 5. 5. Prokhorova, Yu. S., Karakozova, I. V. (2015). Zarubezhnyi i otechestvennyi opyt otsenki stoimosti investitsionno-stroitel'nogo proekta [Foreign and domestic experience in assessing the cost of an investment and construction project]. Ekonomika i predprinimatel'stvo [Economics and Entrepreneurship]. No. 6-3 (59), pp. 608-613 (in Russian).
|
|