Author:
Teplická Katarína,Kováč Martin,Škvareková Erika,Seňová Andrea
Abstract
The main goal of this article is to determine the optimal time period of boiler for biomass renewal, because its usage affects the financial situation of the firm in the form of costs. In this contribution is applied the method of operational research - the method of optimal time of machine renovation. The results of the analyses point to the optimal period of biomass boiler renovation before its service life in the 11th year. Operating costs are increasing about 9% after this time. By using this model there is ability to plan financial sources for buying new biomass boiler at 5500-15600€ on the market. The scientific benefit lies in the fact that the model is applicable to all types of equipment and machinery, in various industrial areas and in services and it is preventive instrument for financial planning for machine renovation.
Publisher
Association for Information Communication Technology Education and Science (UIKTEN)
Subject
Management of Technology and Innovation,Information Systems and Management,Strategy and Management,Education,Information Systems,Computer Science (miscellaneous)
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献