1. Alford, C., 1995. Optimisation in Underground Mine Design, 25th Application of Computers and Operations Research in The Mineral Industry, The Australian Institute of Mining and Metallurgy, pp. 213-218.
2. Ataee-Pour, M., 2000. A Heuristic Algorithm to Optimise Stope Boundaries, PhD thesis, University of Wollongong, Australia, pp. (2) 24-60, (3) 18-36.
3. Ataee-Pour, M., 2005. A Critical Survey of the Existing Stope Layout Optimization Techniques, Journal of Mining Science, 41(5):447-466.
4. Bai, X., Marcotte, D., Simon, R., 2013. Underground Stope Optimization with Network Flow Method, Computer and Geoscience, (52), pp. 361–371.
5. Brazil, M., Thomas, D.A., Weng, J.F., 1998. Gradient- Constrained Minimal Steiner Trees, DIMACS: Series in Discrete Mathematics and Theoretical Computer Science, 40: 23–38.