Affiliation:
1. MANİSA CELAL BAYAR UNIVERSITY, FACULTY OF EDUCATION
Abstract
A 30 kWp rooftop solar photovoltaic (PV) power plant was modelled using energy balance equations, 3-year energy production and its economic return is calculated according to the feed-in tariff agreement. Electricity production was calculated on an hourly basis, and the actual results and simulation results were closely compatible. The system generated 45.35 MWh, 47.05 MWh and 46.34 MWh of energy in year 1, 2 and 3, respectively. It has been observed that the performance ratio of the PV system varies between 84.50 % and 90.27 %, while the capacity factor varies between 17.26 % and 17.63%. While 93.90 MWh of electrical energy has been injected into the grid over a 3-year period, 46.40 MWh of energy has been taken from the grid. The price of electricity injected and consumed was calculated according to the FIT conditions at the time the system was installed, and the payback period was calculated as approximately 6 years.
Publisher
Makina Muhendisleri Odasi (Chamber of Mechanical Engineering)
Reference52 articles.
1. J. A. Duffie and W. A. Beckman, Solar Engineering of Thermal Processes, 2nd ed. Newyork: John Wiley & Sons Inc., 1991.
2. R. J. Cole and N. S. Sturrock, “The convective heat exchange at the external surface of buildings,” Building and Environment, vol. 12, no. 4, pp. 207–214, 1977, doi: https://doi.org/10.1016/0360-1323(77)90021-X.
3. A. Gaur and G. N. Tiwari, “Performance of Photovoltaic Modules of Different Solar Cells,” Journal of Solar Energy, vol. 2013, pp. 1–13, 2013, doi: 10.1155/2013/734581.
4. REN21, “Global Status Report,” Paris, France, 2019.
5. BP, “Statistical Rewiev of World Energy,” London, UK, 2019.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献