Author:
V. Khade Vipin,D. Joshi Sanjay
Abstract
The delivery process of ready-mix concrete (RMC) is a critical component in construction projects, influencing the quality, efficiency, and timeliness of concrete placement. This abstract explores the various factors that impact the RMC delivery process, ranging from logistical considerations to concrete properties and customer requirements. Key factors affecting RMC delivery include the distance to the construction site, traffic conditions, weather, regulatory constraints, batching plant operations, order volume, customer specifications, concrete mix design, truck capacity, and communication channels among stakeholders. Each of these factors can significantly influence the success of RMC delivery, posing challenges and opportunities for optimization.
Publisher
International Journal of Innovative Science and Research Technology
Reference24 articles.
1. Walke R C and Topkar V M,” Qualitative Analysis of Internal and External Risks for Ready Mix Concrete Plants”, IOSR Journal of Engineering, Vol. 2, No. 5, pp. 1013-1019.
2. Sudeshna Wawhal and Abhijit Warudkar,” Productivity of Batching Plant and Quality of Concrete Production”, International Journal of Advance Research, Ideas and Innovations in Technology, Vol. 3, No. 1, pp. 18-21.
3. Baker and Ayechew (2003) A genetic algorithm for the vehicle routing problem Computers & Operations ResearchVolume 30, Issue 5, April 2003, Pages 787-800
4. Feng et al. (2004) Optimizing the schedule of dispatching RMC trucks through genetic algorithms May 2004 Automation in Construction 13(3):327-340
5. Naso et al. (2007) An optimal scheduling model for ready mixed concrete supply with overtime considerations Automation in Construction Volume 16, Issue 6, September 2007, Pages 734-744
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献