Author:
Fatwa Afghoni Trima,Prasetya Dwi Indra,Suwarno Agus,Wiyatno Tri Ngudi
Abstract
Measuring working time is an attempt to determine the length of working time required by a trained employee to complete a job at a normal speed level. To increase work efficiency for employees, both time and energy, research was carried out to determine time Standard ds, time allowances and output Standard ds for the company, so that the production process runs better. In this research, the time for each process will be measured with a stopwatch, which will then be used to calculate cross-production balance. The results of the work measurement research on the deburing line show that the ideal planning that should be set by management for each product is 07K for 8 working hours, namely 987 pcs and 1233 for 10 working hours, 3DM for 8 working hours, namely 764 pcs and 955 for 10 Working hours, 01Y for 8 working hours, namely 868 pcs and 1085 pcs for 10 working hours, 01D for 8 working hours, namely 810 and 1012 pcs for 10 working hours, 01S for 8 working hours, namely 820 pcs and 1025 pcs for 10 working hours, 5SM for 8 working hours, namely 849 pcs and 1061 pcs for 10 working hours, 457 for 8 working hours, namely 294 pcs and 368 pcs for 10 working hours, 874 for 8 working hours, namely 784 pcs and 980 pcs for 10 working hours, and 908 1-C for 8 working hours, namely 634 pcs and 792 pcs for 10 working hours.
Publisher
International Journal of Innovative Science and Research Technology
Reference57 articles.
1. Arianie, G. P., & Puspitasari, N. B. (2017). PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SOURCE DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd). J@ti Undip : Jurnal Teknik Industri, 12(3), 189. https://doi.org/10.14710/jati.12.3.189-196
2. Asarela, S., & Sari, R. P. (2023). Analisis Pengukuran Kerja Menentukan Waktu Baku Menggunakan Metode Jam Henti Terhadap Operator Persiapan Komponen (Studi Kasus: PT XYZ). Jurnal Serambi Engineering, 8(3), 6479–6486. https://doi.org/10.32672/jse. v8i3.6315
3. Bloom, N., & Reenen, J. Van. (2013). Pengukuran Kerja Direct Stopwatch Time-Study. NBER Working Papers, 89. http://www.nber.org/papers/w16019
4. Buku Product tivitas Kerja Dr. Candra Wijaya, M.Pd. (n.d.).
5. Cut Ita Erliana, ST, M. (2015). Analisa dan Pengukuran Kerja. In Jurnal Penelitian Pendidikan Guru Sekolah Dasar (Vol. 6, Issue August).
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献