1. AhmedS. FaulknerT.andMuggliR.2000.Drilling with the “headlights on”: drill‐bit seismic applications in drilling optimizations.The 2000 SPE Saudi Arabia Technical Symposium Middle East October 21–23.
2. Improved accuracy of cross-borehole radar velocity models for ice property analysis
3. BajramE. GiangL. KokJ.andHudsonD.2017.Top of coal detection in a rotary air blast drill rig. Final Report for Project C24064 Australian Coal Association Research Program (ACARP).
4. BajramE. HudsonD.andAdamS.2015.RAB drill rig top of coal detection while drilling. Final Report for Project C21005 Australian Coal Association Research Program (ACARP).
5. Screened and unscreened axially-cylindrical surface-waves