1. 3 “Analysis and Evaluation Report of Joint Logistics Over-The-Shore II (JLOTS II) Throughput Test”, DoD Joint Test Director, JLOTS II, Aug 1985.
2. 4 “Report of Test, Joint Logistics Over The Shore II (JLOTS II), Roll-on/Roll-off Ship Operations”, DoD Joint Test Director, JLOTS II, 19 Mar 1984.
3. 5 “Quick Look Report-JLOTS III Display Determination 91”, DoD Joint Test Director JLOTS III, Ft. Story, Va. //ATZF-FS-JLOTS//, Message Number 192300Z Nov 1991.