1. Improvements in Ship Af-fordabiJity;Bosworth;SNAME Transactions,1993
2. Comparison of the Construction Planning and Manpower Schedules for Building the PD214 General Mobilization Ship in a U.S. Shipyard and in a Japanese Shipyard;Bunch;Joumal of Ship Production.,1987
3. 3. CDNSWC, Philadelphia, letter. Code 15.1, T. Klingensmith to NAVSEA 05Y21G. Brown, “Overview of Data and Processes used in Analysis” [of Fire Pump Failures], March 4 1993.
4. 4. Cecere, Michael L. , Jack Abbott , Michael Bosworth , and Tracy Valsi , “Commonality Based Naval Ship Design and Production,” 1993 Ship Production Symposium, Williamsburg. VA November 1-4 1993.
5. 5. Dayton T. Brown , Engineering and Test Division, “Design Trade-Off Report for the Standard Fire Pump Module,” DTB Report No. DTB03R94-0151. March 1994.