Author:
CHENG T. C. EDWIN,GUPTA JATINDER N. D.,WANG GUOQING
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Management Science and Operations Research
Reference112 articles.
1. “Total Flowtime in No-wait Flowshops with Separated Setup Times”;Aldowaisan;Computers and Operations Research,1998
2. “Minimizing Mean Flowtime in a Two Machine Flowshop with Sequence Independent Setup Times Separated”;Allahverdi;Computers and Operations Research,2000
3. “Job Lateness in Flowshops with Setup and Removal Times Separated”;Allahverdi;Journal of the Operational Research Society,1998
4. “A Review of Scheduling Research Involving Setup Considerations”;Allahverdi;OMEGA, International Journal of Management Sciences,1999
5. “Two-Machine Flowshop with Separated Sequence-Independent Setup Times: Mean Completion Time Criterion”;Bagga;Indian Journal of Management and Systems,1986
Cited by
141 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献