TECHNICAL NOTE: A SIMPLE MODEL FOR OPTIMIZING THE SINGLE MACHINE EARLY/TARDY PROBLEM WITH SEQUENCE-DEPENDENT SETUPS
Author:
Publisher
Wiley
Subject
Management of Technology and Innovation,Industrial and Manufacturing Engineering,Management Science and Operations Research
Link
http://onlinelibrary.wiley.com/wol1/doi/10.1111/j.1937-5956.1992.tb00354.x/fullpdf
Reference14 articles.
1. “Minimizing Mean Absolute Deviation of Completion Times About a Common Due Date,”;Bagchi;Naval Research Logistics Quarterly,1986
2. “Minimizing Mean Squared Deviation of Completion Times About a Common Due Date,”;Bagchi;Management Science,1987
3. “Minimizing Weighted Absolute Deviation in Single Machine Scheduling,”;Fry;IIE Transactions,1987
Cited by 37 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. INEH-VNS Algorithm Solved Automatic Production System Scheduling Problem under Just-in-Time Environment;Journal of Applied Mathematics;2023-11-17
2. Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension;Omega;2021-09
3. Three stage dynamic heuristic for multiple plants capacitated lot sizing with sequence-dependent transient costs;Computers & Industrial Engineering;2019-01
4. A sequence dependent single machine scheduling problem with fuzzy axiomatic design for the penalty costs;Computers & Industrial Engineering;2016-02
5. Single Machine Scheduling for Minimizing Earliness/Tardiness Penalties with Sequence-Dependent Setup Times;Toward Sustainable Operations of Supply Chain and Logistics Systems;2015
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3