1. (1) Subcommittee for Power Distribution Systems, Lightning Protection Design Committee: “Guide of Lightning Protection Design for Power Distribution Lines”, CRIEPI Report, T69 (2002) (in Japanese)
2. 耐雷設計委員会 配電分科会:「配電線耐雷設計ガイド」, 電中研総合報告, T69 (2002)
3. (2) K. Ishimoto, R. Mori, A. Asakawa, S. Hara, and N. Arai: “Study on Wire Breaking in Mid-Span of Distribution Lines due to Lightning—Evaluation of Phase-to-Phase Sparkover Rates due to Direct Lightning Strike—”, CRIEPI Report, H17002 (2018) (in Japanese)
4. 石本和之・森 亮太・浅川 聡・原 慎吾・新井伸隆:「雷による配電線径間途中断線に関する検討—径間途中への雷撃による相導体間スパークオーバ発生率評価—」, 電中研研究報告, H17002 (2018)
5. (3) K. Ishimoto: “Development of Lightning Outage Rate Calculation Program for Medium Voltage Distribution Lines (I)—Calculation of Lightning Outage Rate due to Direct Lightning Strike and Its Application to Lightning Risk Assessment—”, CRIEPI Report, H19001 (2020) (in Japanese)