1. (1) O. Takahashi, M. Matsumoto, T. Egawa, T. Furukawa, T. Sawa, and T. Suzuki: “Development of Optimal Scheduling Algorithm for Cascade Hydro Power Plants using Interior Point Method”, Proc. of 2006 Annual Conference of Power and Energy Society, IEE Japan, 462 (2006) (in Japanese)
2. 高橋 修.松本光裕.江川敏久.古川俊行.澤 敏之.鈴木隆之: 「内点法を用いた連接水系の最適運用計画アルゴリズムの開発」, 平成18年電気学会電力.エネルギー部門大会, 462 (2006)
3. (2) M. Nishikawa, Y. Ohta, and Y. Iwakami: “Study on the Practical Use of the Flood Runoff Forecasting System for Rivers in the Chubu Region”, The Papers of Joint Technical Meeting on Power Engineering and Power Systems Engineering, IEE Japan, PE-99-23, pp. 89-94 (1999) (in Japanese)
4. 西川正人.太田義法.岩上泰弘: 「中部管内出水予測の実用化研究」, 電気学会電力技術研資, PE-99-23, pp. 89-94 (1999)
5. Hydropower Output Forecast with Tank Models Combined with Kalman Filter Estimation