1. (1) H. Ravn and J. M. Rygaard: “Optimal scheduling of coproduction with a storage”, J. Eng., Vol. 22, pp. 267-281 (1994)
2. (2) K. Ito, T. Shiba, and R. Yokoyama: “Optimal Operation of a Cogeneration Plant in Combination with Electric Heat Pumps”, J. Energy Resources Technol., Vol. 116, No. 1, pp. 56-64 (1994)
3. (3) R. Yokoyama and K. Ito: “A Revised Decomposition Method for MILP Problems and Its Application to Operational Planning of Thermal Storage Systems”, J. Energy Resources Technol., Vol. 118, pp. 277-284 (1996)
4. (4) T. Tsukada, T. Tamura, S. Kitagawa, and Y. Fukuyama: “Optimal operational planning for cogeneration system using particle swarm optimization”, Proc. of the 2003 IEEE Swarm Intelligence Symposium, pp. 138-143 (2003)
5. (5) T. Tsukada, S. Kitagawa, and Y. Fukuyama: “Particle swarm optimization for optimal operational planning of a cogeneration plant”, Proc. of Metaheuristics International Conference (MIC2003), No. 74, pp. 1-7 (2003)