1. (1) Y. Yamamoto, T. Namera, T. Otaka, H. Ito, and M. Tari, “Successful Manufacturing and Shop Testing of the World's Largest Tandem 2-pole, 60 Hz, 1000 MW Turbine Generator,” IEEE summer meeting (2001)
2. (2) R. Joho, Y. Sabater, H. Ferretto, D. Abraham, and W. Ferens : “Hydrogen/water-cooled turbogenerator: a mature technology on the move”, CIGRE 2008, A1-117 (2008)
3. (3) K. Sedlazeck, W. Adelmann, H. Bailly, I. Gahbler, H. Harders, U. Kainka, W. Weiss, B. Scholz, and S. Henshel : “Influence of customer's specifications upon design features of the EPR turbogenerator”, CIGRE 2002, 11-106 (2002)
4. (4) Guo Jianhong, Yuan Jian-hua, Fu Deping, Luan Ru, and Xiong Bin : “300 MW Level Evaporative Cooling Turbine Generator Stator Temperature Field Analysis”, ICEMS2009, VDS1 G5-4 (2009)
5. (5) C. Ginet, R. Joho, and K. Mayor : “Range extension of the air-cooled TOPAIR turbogenerator”, Power-Gen Europe (2008-6)