Pertes de charge des ancrages actifs injectés dans un massif rocheux
-
Published:1989-02-01
Issue:1
Volume:16
Page:72-81
-
ISSN:0315-1468
-
Container-title:Canadian Journal of Civil Engineering
-
language:en
-
Short-container-title:Can. J. Civ. Eng.
Author:
Benmokrane Brahim,Ballivy Gérard
Abstract
Estimation of loss of prestress is an essential part of the design of permanent or temporary prstressed anchors since stability of the retained structure must not be compromised. Findings of a field study on long-term behaviour of prestressed anchors are presented herein: different lengths of anchors in solid rock were injected with cement grout or epoxy resin. Load variation in the anchors with time indicated two distinct stages of loss of prestress: an initial stage of rapid loss of prestress and a second stage of very minor and uniform loss ending about 6 months after prestressing. Our study also showed that restressing anchors after a period of time reduces subsequent prestress loss and that overdimensioning of the injected length does not. Key words: rock, prestressed injected anchor, grout, loss of prestress, creep, relaxation.
Publisher
Canadian Science Publishing
Subject
General Environmental Science,Civil and Structural Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献