Simulation of the construction of cable-stayed bridges

Author:

Abraham Dulcy M,Halpin Daniel W

Abstract

Cable-stayed bridges are ideal for spanning natural barriers of wide rivers, deep valleys, or ravines, and for pedestrian bridges crossing wide interstate highways. Modern construction of cable-stayed bridges makes use of the segmental balanced cantilever techniques and involves many repetitive cycles of placing the concrete segments (both cast-in-place and precast) and supporting cables. It provides a fertile area for the application of computer simulation techniques for the planning and analysis of the process, particularly for studying the interaction of resources used in the construction phase and also for assessing the productivity of the construction processes. This paper employs MicroCYCLONE, a microcomputer-based simulation program, for the modeling and simulation of the construction of two cable-stayed bridges: the Dame Point Bridge in the state of Florida, U.S.A., and the Tsukuhara Bridge in Hyuougo, Japan. The paper will also provide a brief explanation of the suspended long traveler method used on the Tsukuhara Bridge, the simulation models developed to analyze the construction processes, and the results of sensitivity analyses.Key words: simulation, modeling, construction, cable-stayed bridges, resources, productivity, balanced cantilever construction.

Publisher

Canadian Science Publishing

Subject

General Environmental Science,Civil and Structural Engineering

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3